ReNews Pakistan is a dedicated digital news platform focused exclusively
on real estate, urban development, infrastructure, and property markets
across Pakistan. It delivers timely updates, policy developments, market
insights, and ground realities shaping the country's land and housing sector.
The platform is structured into
news categories, regional coverage, corporate updates,
and research-based analysis to ensure accurate,
transparent, and sector-specific reporting.
Explore the divisions of Sindh, a major province in Pakistan with strategic coastal regions,
agricultural zones, and rapidly growing urban real estate hubs.
Governs land revenue, territorial administration, and overall land management across
Sindh.
Sindh Land Records
Authority (SLRA)
Responsible for digitization, maintenance, and verification of rural land records in
Sindh.
Sindh Local Government
& Housing Town Planning Department
Oversees urban development, housing schemes, town planning, and municipal
governance.
Sindh Building Control
Authority (SBCA)
Regulates building approvals, construction standards, and urban compliance within
Sindh.
Important Updates from Sindh
Real Estate & Land News
Published: April 9, 2026 at 2:42 PM
Murtaza Wahab Launches Dual Carriageway Project for Sakhi Hassan Road
مرتضیٰ وہاب نے سخی حسن روڈ کو جدید دو رویہ شاہراہ میں تبدیل کرنے کے منصوبے کا سنگ بنیاد رکھ دیا
▫️Project part of a wider plan to rehabilitate 26 roads across Karachi
▫️یہ منصوبہ کراچی بھر میں 26 شاہراہوں کی تعمیر و بحالی کے جامع پروگرام کا حصہ ہے
Karachi : ReNews Pakistan Mayor Karachi Murtaza Wahab on Tuesday laid the foundation stone for the improvement and rehabilitation of...
Karachi : ReNews Pakistan
Mayor Karachi Murtaza Wahab on Tuesday laid the foundation stone for the improvement and rehabilitation of Sakhi Hassan Road in North Nazimabad, as part of the city’s ongoing infrastructure development drive led by the Karachi Metropolitan Corporation (KMC).
The project, estimated at Rs140 million, will convert the 0.883 kilometre stretch into a modern dual carriageway with a width of 30 feet. It also includes road rehabilitation, drainage system upgrades, and other civic improvements aimed at easing traffic congestion and addressing rainwater accumulation caused by nearby hilly areas, particularly around Sakhi Hassan Graveyard and adjoining localities.
Speaking on the occasion, the mayor said the initiative is part of a broader programme under which 26 roads across Karachi are being constructed and rehabilitated.
He noted that development work worth approximately Rs68 billion is currently underway in the city, including completed projects such as Shahrah e Noor Jahan and ongoing work on major arteries like Sher Shah Suri Road and Shahrah e Bhutto from Qayyumabad to Kathore in Gadap Town.
Murtaza Wahab further stated that the upgraded drainage system on Sakhi Hassan Road would ensure proper disposal of rainwater, providing much-needed relief to residents. He reaffirmed that improving transportation facilities and civic infrastructure remains a top priority for KMC, adding that all ongoing projects will be completed within stipulated timelines.
کراچی : ری نیوز پاکستان
میئر کراچی مرتضیٰ وہاب نے نارتھ ناظم آباد میں سخی حسن روڈ کی بہتری اور بحالی کے منصوبے کا سنگِ بنیاد رکھ دیا، جو کراچی میٹرو پولیٹن کارپوریشن (کے ایم سی) کی جانب سے شہر میں جاری انفراسٹرکچر اپ گریڈیشن مہم کا حصہ ہے۔
تقریباً 14 کروڑ روپے لاگت سے مکمل ہونے والے اس منصوبے کے تحت 0.883 کلومیٹر طویل سڑک کو 30 فٹ چوڑی جدید دو رویہ شاہراہ میں تبدیل کیا جائے گا۔ منصوبے میں سڑک کی بحالی، نکاسیٔ آب کے نظام کی بہتری اور دیگر بنیادی شہری سہولیات کی فراہمی شامل ہے، جس کا مقصد ٹریفک کے بہاؤ کو بہتر بنانا اور قریبی پہاڑی علاقوں سے آنے والے برساتی پانی کے مسائل کو کم کرنا ہے۔
اس موقع پر گفتگو کرتے ہوئے میئر کراچی نے کہا کہ یہ منصوبہ شہر بھر میں 26 اہم شاہراہوں کی تعمیر و بحالی کے وسیع پروگرام کا حصہ ہے۔ انہوں نے بتایا کہ کراچی میں اس وقت تقریباً 68 ارب روپے کے ترقیاتی منصوبوں پر کام جاری ہے، جن میں شاہراہِ نور جہاں جیسے مکمل شدہ منصوبے اور شیر شاہ سوری روڈ سمیت قیوم آباد سے کاٹھور (گڈاپ ٹاؤن) تک شاہراہِ بھٹو پر جاری کام شامل ہیں۔
مرتضیٰ وہاب نے مزید کہا کہ سخی حسن روڈ پر جدید نکاسیٔ آب کا نظام بارش کے پانی کی بروقت نکاسی کو یقینی بنائے گا، جس سے علاقہ مکینوں کو نمایاں ریلیف ملے گا۔ انہوں نے اس عزم کا اعادہ کیا کہ شہری سفری سہولیات اور بنیادی ڈھانچے کی بہتری کے لیے کے ایم سی تمام جاری منصوبوں کو مقررہ مدت میں مکمل کرے گی۔
Published: April 9, 2026 at 2:10 PM
Abdul Aleem Khan Orders Fast track Completion of NHA Projects in Sindh
عبدالعلیم خان کی سندھ میں این ایچ اے منصوبوں کو جلد مکمل کرنے کی ہدایت
▫️Minister directs urgent action on key highways including N-5, N-55 and M-6 Motorway
▫️سندھ میں مستقبل کے تمام ٹول پلازوں کا ڈیزائن یکساں ہونا چاہیے، وفاقی وزیر کی ہدایت
Karachi | ReNews Pakistan Federal Minister for Communications Abdul Aleem Khan has directed the National Highway Authority (NHA) to accelerate...
Karachi | ReNews Pakistan
Federal Minister for Communications Abdul Aleem Khan has directed the National Highway Authority (NHA) to accelerate the completion of ongoing and pending infrastructure projects across Sindh, warning that delays will not be tolerated.
Chairing a high level review meeting at the NHA Regional Office in Karachi, the minister was briefed on the progress of major highway schemes in the province. Discussions centered on resolving administrative bottlenecks and addressing security challenges to ensure smooth and timely execution of projects.
A detailed review of key national routes, including N-5, N-55, N-120, N-110, as well as the strategically important M-6 Motorway, was conducted. The minister also issued directives to improve bridge infrastructure and enhance the efficiency of the toll tax collection system.
Emphasizing quality and accountability, Aleem Khan stated that no compromise would be made on construction standards and transparency. He approved the formation of special teams to tackle project related issues and instructed officials to submit weekly progress reports.
The minister further directed that all future toll plazas in Sindh adopt a uniform design to facilitate commuters. He also announced performance based incentives for NHA staff to encourage efficiency and timely delivery.
Reaffirming the government’s commitment to modernizing infrastructure, he called for better procurement practices and improved contract management, particularly for the M-6 Motorway project.
کراچی: ری نیوز پاکستان
وفاقی وزیر برائے مواصلات عبدالعلیم خان نے نیشنل ہائی وے اتھارٹی (این ایچ اے) کو ہدایت کی ہے کہ سندھ بھر میں جاری اور زیر التواء انفراسٹرکچر منصوبوں کو تیزی سے مکمل کیا جائے، اور خبردار کیا کہ تاخیر کسی صورت برداشت نہیں کی جائے گی۔
کراچی میں این ایچ اے کے علاقائی دفتر میں ایک اعلیٰ سطحی اجلاس کی صدارت کرتے ہوئے وفاقی وزیر کو صوبے میں جاری اہم شاہراہوں کے منصوبوں کی پیش رفت پر بریفنگ دی گئی۔ اجلاس میں انتظامی رکاوٹوں کے خاتمے اور سکیورٹی مسائل کے حل پر غور کیا گیا تاکہ منصوبوں کی بروقت اور ہموار تکمیل یقینی بنائی جا سکے۔
اہم شاہراہوں N-5، N-55، N-120، N-110 اور سٹریٹجک اہمیت کی حامل M-6 موٹروے کا تفصیلی جائزہ لیا گیا۔ انہوں نے پلوں کے انفراسٹرکچر کو بہتر بنانے اور ٹول ٹیکس وصولی کے نظام کو مزید مؤثر بنانے کی بھی ہدایت کی۔
عبدالعلیم خان نے تعمیراتی معیار اور شفافیت پر زور دیتے ہوئے کہا کہ معیار پر کوئی سمجھوتہ نہیں کیا جائے گا۔ انہوں نے شاہراہ منصوبوں سے متعلق مسائل کے حل کے لیے خصوصی ٹیمیں بنانے کی منظوری دی اور حکام کو ہفتہ وار پیش رفت رپورٹ پیش کرنے کی ہدایت کی۔
انہوں نے مزید کہا کہ سندھ میں مستقبل کے تمام ٹول پلازوں کا ڈیزائن یکساں ہونا چاہیے تاکہ مسافروں کو بہتر سہولیات فراہم کی جا سکیں۔ وزیر نے بہتر کارکردگی دکھانے والے این ایچ اے عملے کے لیے مراعات کا بھی اعلان کیا۔
حکومت کے جدید انفراسٹرکچر کے عزم کو دہراتے ہوئے انہوں نے خاص طور پر M-6 موٹروے منصوبے کے لیے خریداری کے عمل اور معاہدہ جاتی نظام کو مزید بہتر بنانے پر زور دیا۔
Published: April 2, 2026 at 3:35 PM
KMC Denies Approving Land Use Change for Gul Plaza
کے ایم سی نے گل پلازہ کے لینڈ یوز میں تبدیلی کی منظوری دینے کی تردید کر دی
▫️Municipal Commissioner tells Judicial Commission no record of approval exists
▫️ لینڈ یوز شرائط کی تعمیل سے متعلق کسی آڈٹ یا جائزے کا کوئی ریکارڈ دستیاب نہیں، رپورٹ ریونیو بورڈ
Karachi | ReNews Pakistan The Municipal Commissioner of the Karachi Metropolitan Corporation (KMC) has informed the Judicial Commission investigating the...
Karachi | ReNews Pakistan
The Municipal Commissioner of the Karachi Metropolitan Corporation (KMC) has informed the Judicial Commission investigating the Gul Plaza fire tragedy that no approval was ever granted for any change in the building’s land use.
In a written response submitted before the commission, the municipal commissioner stated that the clarification was provided after a thorough internal review of official records. The commission had earlier sought an explanation regarding the building’s land status.
According to the reply, a report from the KMC Director Land also confirmed that there is no record of any such approval. It was further maintained that since the land came under KMC’s administrative control, no change in its status has been documented in official records.
The response emphasized that the findings were based on a detailed examination of the Land Department’s record and clarified that no other legal proceedings would be affected by this position.
Meanwhile, the Senior Member of the Board of Revenue (BoR) has also submitted a separate report to the Judicial Commission, detailing the ownership and record of the Gul Plaza land. The report stated that the plot originally belongs to the provincial government, while KMC only exercised limited administrative and financial authority over it.
It further noted that no audit or review is available on record regarding compliance with the original land use conditions. The BoR’s findings were compiled using records from the District Registrar Karachi, Deputy Director Lands KMC, and Mukhtiarkar Saddar.
According to the report, the land, measuring approximately 8,128 square yards, was initially recorded as property of the Karachi municipality.
کراچی | ری نیوز پاکستان
کراچی میٹروپولیٹن کارپوریشن (کے ایم سی) کے میونسپل کمشنر نے گل پلازہ آتشزدگی سانحے کی تحقیقات کرنے والے جوڈیشل کمیشن کو آگاہ کیا ہے کہ عمارت کے لینڈ یوز میں کسی قسم کی تبدیلی کی کبھی منظوری نہیں دی گئی۔
کمیشن میں جمع کرائے گئے تحریری جواب میں میونسپل کمشنر نے بتایا کہ یہ وضاحت سرکاری ریکارڈ کے تفصیلی داخلی جائزے کے بعد فراہم کی گئی۔ کمیشن نے اس سے قبل عمارت کی اراضی کے سٹیٹس سے متعلق وضاحت طلب کی تھی۔
جواب کے مطابق کے ایم سی کے ڈائریکٹر لینڈ کی رپورٹ میں بھی تصدیق کی گئی ہے کہ اس حوالے سے کسی قسم کی منظوری کا کوئی ریکارڈ موجود نہیں۔ مزید کہا گیا کہ جب سے یہ زمین کے ایم سی کے انتظامی کنٹرول میں آئی ہے، اس کی حیثیت میں کسی تبدیلی کا کوئی اندراج سرکاری ریکارڈ میں موجود نہیں۔
جواب میں اس بات پر زور دیا گیا کہ یہ نتائج لینڈ ڈیپارٹمنٹ کے ریکارڈ کے مکمل جائزے کی بنیاد پر اخذ کیے گئے ہیں اور اس مؤقف سے کسی دیگر قانونی کارروائی پر کوئی اثر نہیں پڑے گا۔
دوسری جانب بورڈ آف ریونیو کے سینئر ممبر نے بھی جوڈیشل کمیشن میں ایک علیحدہ رپورٹ جمع کرائی ہے جس میں گل پلازہ کی زمین کی ملکیت اور ریکارڈ کی تفصیلات فراہم کی گئی ہیں۔ رپورٹ کے مطابق پلاٹ اصل میں صوبائی حکومت کی ملکیت ہے جبکہ کے ایم سی کو اس پر صرف محدود انتظامی اور مالی اختیارات حاصل تھے۔
رپورٹ میں یہ بھی بتایا گیا کہ اصل لینڈ یوز شرائط کی تعمیل سے متعلق کسی آڈٹ یا جائزے کا کوئی ریکارڈ دستیاب نہیں۔ بی او آر کی رپورٹ ڈسٹرکٹ رجسٹرار کراچی، ڈپٹی ڈائریکٹر لینڈز کے ایم سی اور مختیارکار صدر سے حاصل کردہ ریکارڈ کی بنیاد پر مرتب کی گئی۔
رپورٹ کے مطابق تقریباً 8,128 مربع گز پر مشتمل یہ زمین ابتدائی طور پر کراچی میونسپلٹی کی ملکیت کے طور پر درج ہے۔